logo
ProjectClosed

Republic Pathway Improvements Phase 2

Sector: Road • Location: Republic, Washington, United States of America

Source: Dodge

Republic Pathway Phase 2 - Safe Routes for Students Along SR20 Construct pathway that begins at the existing west crosswalk that accesses the Republic School complex and runs to the east Republic School Distict SR 20/21 crosswalk and ties together two segments of existing pathway that parallels SR 20/21. PE is fully funded with federal funds utilizing Toll Credit for local match. The Project inclu

Status
Closed
Sector
Road, Car parking, Automotive, Education, Power Transmission, Power Generation (CCGT), Government, Commercial
Location
Republic, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Republic Pathway Improvements Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Republic Pathway Improvements Phase 2” is an infrastructure initiative in the Road sector, located in Republic, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Republic Pathway Phase 2 - Safe Routes for Students Along SR20 Construct pathway that begins at the existing west crosswalk that accesses the Republic School complex and runs to the east Republic School Distict SR 20/21 crosswalk and ties together two segments of existing pathway that parallels SR 20/21. PE is fully funded with federal funds utilizing Toll Credit for local match. The Project includes the following Work: Roadway excavation and haul of approximately 550 CY Construction of appro...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Republic

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Car parking, Automotive, Education, Power Transmission, Power Generation (CCGT), Government, Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project