Res- 870-1 Reservoir Cover/Liner Replacement
Sector: Cement • Location: Spring Valley, California, United States of America
Source: Dodge USA
The general scope of work involves the construction of a new 3.4 million gallon AWWA Type I - cast-in-place concrete reservoir, yard piping, improvements to an existing 11 million gallon earthen embankment reservoir including existing floating cover and liner replacement and below grade pipe replacement, existing access road improvements, and all other associated work and appurtenances in accordan
- Status
- Closed
- Sector
- Cement, Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment
- Location
- Spring Valley, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Res- 870-1 Reservoir Cover/Liner Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The general scope of work involves the construction of a new 3.4 million gallon AWWA Type I - cast-in-place concrete reservoir, yard piping, improvements to an existing 11 million gallon earthen embankment reservoir including existing floating cover and liner replacement and below grade pipe replacement, existing access road improvements, and all other associated work and appurtenances in accordance with the Contract Documents. Construction management and inspection services for the construct... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Spring Valley |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
