Reseau Electrique de Montreal (REM) Light Rail Transit (LRT) PPP
Sector: Airport • Location: Canada
Source: InfraPPPWorld
The REM Project is a fully automated, electric light rail transit (LRT) system, made up of 67 km of dedicated rail lines, with 50% of the tracks occupying existing rail corridors and 30% following existing highways. The REM will include four branches connecting downtown Montréal, the South Shore, the West Island, the North Shore and the airport, resulting in two new high-frequency public transit s
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | financial close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The REM Project is a fully automated, electric light rail transit (LRT) system, made up of 67 km of dedicated rail lines, with 50% of the tracks occupying existing rail corridors and 30% following existing highways. The REM will include four branches connecting downtown Montréal, the South Shore, the West Island, the North Shore and the airport, resulting in two new high-frequency public transit service lines to key employment hubs. The South Shore section includes a new 15‑km branch that will start in Brossard, southeast of the A‑10/A‑30 interchange and include the A-10 corridor leading downtown, connecting to Central Station. The Deux-Montagnes Branch will leverage the Deux-Montagnes commuter train line, the existing rail corridor dedicated to passenger transportation. The line will be transformed into a 31‑km LRT branch line that will link Deux-Montagnes with downtown Montréal. The new Sainte-Anne-de-Bellevue branch will run along the Deux-Montagnes corridor to the A-13. It will then branch off towards the existing Doney right-of-way line (in the Montréal Technoparc) along the A-40 line to Sainte-Anne-de-Bellevue. This 16‑km branch will connect Sainte-Anne-de-Bellevue to downtown Montréal via the A-40 line. The new airport branch, about 5-km long, will start at Central Station, run along the Deux-Montagnes and Doney lines and then branch off south to connect with the Montréal-Trudeau Airport. All the lines will connect into a single transit network. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
