Reserved Channel Development Master Report
Sector: Commercial • Location: Boston, Massachusetts, United States of America
Source: Dodge USA
Block A is bound by West First Street, Pappas Way, the new F Street extension, and a new roadway identified herein as Road 1 . Block B is bound by West First Street, E Street, the new F Street extension, and Road 1. Block C is bounded by Pappas Way, and new roadways identified herein as Road 2 , Road 3 , and Road 4
- Status
- Prospective
- Sector
- Commercial, Consumer Products, Residential, Road, Manufacturing (Industrial)
- Location
- Boston, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Reserved Channel Development Master Report
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Block A is bound by West First Street, Pappas Way, the new F Street extension, and a new roadway identified herein as Road 1 . Block B is bound by West First Street, E Street, the new F Street extension, and Road 1. Block C is bounded by Pappas Way, and new roadways identified herein as Road 2 , Road 3 , and Road 4 |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Consumer Products, Residential, Road, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
