Reservoir 3 Replacement Phase 1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Reservoir 3 Replacement Phase 1 - Project Description: The Phase 1 work being performed includes, but is not limited to, furnishing all labor, materials and equipment necessary to construct one 8 million gallon prestressed and partially buried concrete tank, shoring system, dewatering, electrical and instrumentation and control systems, and associated piping and other such appurtenances, including
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment
- Location
- Everett, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Reservoir 3 Replacement Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Reservoir 3 Replacement Phase 1 - Project Description: The Phase 1 work being performed includes, but is not limited to, furnishing all labor, materials and equipment necessary to construct one 8 million gallon prestressed and partially buried concrete tank, shoring system, dewatering, electrical and instrumentation and control systems, and associated piping and other such appurtenances, including trench and tank excavation, haul, stockpiling and disposal, preparation of a project Health and ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Everett |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Power Generation (CCGT), Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
