Reservoir District- Apts- Grocery-Garage - (Parcel 4)
Sector: Car parking • Location: Washington, District of Columbia, United States of America
Source: Dodge USA
280 apartment units at 258,235 square feet - 85 affordable units set aside -Harris Teeter grocery store at 55,565 square feet - 345 space parking garage- 2 levels below grade at 110,000 square feet - total project square feet 423,800. The most significant change of the updated proposal to the Parcel 4 Building will also require minor modifications to the approved exterior design. The original conc
- Status
- Closed
- Sector
- Car parking, Residential, Water Supply and Storage, Commercial, Automotive, Steel, Manufacturing (Industrial)
- Location
- Washington, District of Columbia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Reservoir District- Apts- Grocery-Garage - (Parcel 4)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 280 apartment units at 258,235 square feet - 85 affordable units set aside -Harris Teeter grocery store at 55,565 square feet - 345 space parking garage- 2 levels below grade at 110,000 square feet - total project square feet 423,800. The most significant change of the updated proposal to the Parcel 4 Building will also require minor modifications to the approved exterior design. The original concept contemplated an apartment building for senior residents with a grocery store and other retail... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | District of Columbia |
City | Washington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Residential, Water Supply and Storage, Commercial, Automotive, Steel, Manufacturing (Industrial) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
