Reservoir Expansion & Pump System
Sector: Wind • Location: Winnipeg, Manitoba, Canada
Source: Dodge USA
RM of Morris-Rosenort Reservoir Expansion & Associated Works and Construction of a new concrete two-cell water reservoir with a total capacity of 1000 m3 and a pumphouse. Includes new chlorination system, connections to existing distribution systems vertical turbine pump system, and associated site, process mechanical, electrical and automation
- Status
- Closed
- Sector
- Wind, Cement, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage, Government, Commercial
- Location
- Winnipeg, Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Reservoir Expansion & Pump System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | RM of Morris-Rosenort Reservoir Expansion & Associated Works and Construction of a new concrete two-cell water reservoir with a total capacity of 1000 m3 and a pumphouse. Includes new chlorination system, connections to existing distribution systems vertical turbine pump system, and associated site, process mechanical, electrical and automation |
Procurement method | |
Budget |
Location
Country | Canada |
State | Manitoba |
City | Winnipeg |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Cement, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage, Government, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
