Residential Building Build out
Sector: Manufacturing (Industrial) • Location: Spokane, Washington, United States of America
Source: Dodge
COU SFR to Duplex Phase 1: Finish and Build out as 2 unit duplex. -Top floor will be Unit 1 -Main floor/Basement will be Unit 2 Phase 2 will be to change Duplex to 4 plex to be permitted under separate BLDC permit.
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Commercial, Residential
- Location
- Spokane, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Residential Building Build out
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | COU SFR to Duplex Phase 1: Finish and Build out as 2 unit duplex. -Top floor will be Unit 1 -Main floor/Basement will be Unit 2 Phase 2 will be to change Duplex to 4 plex to be permitted under separate BLDC permit. *Trade Permits to be Pulled Separately* |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Spokane |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
