Residential Development
Planning schematics · California · Last reported Nov 2024
Source: Dodge USA
demolish two existing, multi dwelling residential complexes, and build a new, multi-dwelling, high-rise residential development comprised of 3 towers totaling 1315 units and 1350 parking spaces located at 4149-4249 Nobel Drive. ( two 40-story towers and one 23-story tower)
- Status
- Prospective
- Sector
- Car parking, Commercial, Residential, Manufacturing (Industrial), Automotive
- Location
- San Diego, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Residential Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | demolish two existing, multi dwelling residential complexes, and build a new, multi-dwelling, high-rise residential development comprised of 3 towers totaling 1315 units and 1350 parking spaces located at 4149-4249 Nobel Drive. ( two 40-story towers and one 23-story tower) |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Residential, Manufacturing (Industrial), Automotive |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
