Residential Development
Delayed · Illinois · Last reported Sep 2025
Source: Dodge
build three four-story buildings - structure will hold 10 condominiums paired with 10 parking spaces Eight of the parking spaces will be located on the interior of the ground floor with the remaining two located outside. The unit mix will consist of two- and three-bedroom residences.
- Status
- Failure
- Sector
- Residential, Manufacturing (Industrial), Commercial, Car parking, Automotive
- Location
- Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Residential Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | build three four-story buildings - structure will hold 10 condominiums paired with 10 parking spaces Eight of the parking spaces will be located on the interior of the ground floor with the remaining two located outside. The unit mix will consist of two- and three-bedroom residences. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Residential, Manufacturing (Industrial), Commercial, Car parking, Automotive |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- CR 347/ DAVID'S HOME CHURCH RD @ SCULL SHOAL CREEK
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
