Residential Sound Insulation Program Phase 4
Closed · Vermont · Last reported Apr 2024
Source: Dodge USA
The work generally consists of sound insulation treatments for up to 16 residential properties in South Burlington, VT. The scope of work for each home may include but is not limited to; window and door replacement, HVAC system installation and associated electrical work, insulation, drywall installation, and finish carpentry and painting.
- Status
- Closed
- Sector
- Power Generation (CCGT), Residential, Airport, Government, Commercial, Manufacturing (Industrial)
- Location
- South Burlington, Vermont, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Residential Sound Insulation Program Phase 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work generally consists of sound insulation treatments for up to 16 residential properties in South Burlington, VT. The scope of work for each home may include but is not limited to; window and door replacement, HVAC system installation and associated electrical work, insulation, drywall installation, and finish carpentry and painting. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Vermont |
City | South Burlington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Residential, Airport, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
