logo

Resolution Copper Project

Sector: Metal • Location: Superior, Arizona, United States

Source: Discovery Alert

Project
Delayed

The Resolution Copper Project is a large underground copper mining project located near Superior, Arizona. It targets a deep porphyry copper deposit with resource estimates exceeding 1.6-1.7 billion tonnes at approximately 1.5% copper grade. The project aims to produce about 40 billion pounds of copper over a 40-year lifespan, potentially supplying up to 25% of US copper demand. The project faces

Project Information FAQ

Project Information

3 Q
The project “Resolution Copper Project” is an infrastructure initiative in the Metal sector, located in Superior, Arizona, United States. Taiyo aggregates data on it from Discovery Alert.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

delayed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Resolution Copper Project is a large underground copper mining project located near Superior, Arizona. It targets a deep porphyry copper deposit with resource estimates exceeding 1.6-1.7 billion tonnes at approximately 1.5% copper grade. The project aims to produce about 40 billion pounds of copper over a 40-year lifespan, potentially supplying up to 25% of US copper demand. The project faces significant regulatory, environmental, and indigenous cultural challenges, including a required land exchange with the federal government and opposition due to the impact on the culturally significant Oak Flat area. The mining method proposed is block caving, involving extensive infrastructure development and complex technical challenges due to the depth of the deposit. The project has experienced continuous delays due to regulatory hurdles and legal challenges, with the latest setback being a temporary block on the land transfer by the 9th Circuit Court of Appeals in August 2025.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data