Restaurant Building
Start · Arizona · Last reported Feb 2025
Source: Dodge
Tenant Improvement To Remodel Previous Tenant Restaurant. Type Iii-B Construction And Group A-2 Occupancy. The Remodel Will Relocate The Storefront Reducing The Interior Space And Providing For A Covered Patio Area Within The Existing Building Footprint. The Interior Will Be Reduced To 5,516 Sf And The Patio Will Be Expanded By 1,232 Sf. These Changes Will Occur Within The Footprint Of The Buildin
- Status
- Prospective
- Sector
- Steel, Consumer Products, Power Generation (CCGT), Raw Materials, Commercial, Metal
- Location
- Mesa, Arizona, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Restaurant Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Tenant Improvement To Remodel Previous Tenant Restaurant. Type Iii-B Construction And Group A-2 Occupancy. The Remodel Will Relocate The Storefront Reducing The Interior Space And Providing For A Covered Patio Area Within The Existing Building Footprint. The Interior Will Be Reduced To 5,516 Sf And The Patio Will Be Expanded By 1,232 Sf. These Changes Will Occur Within The Footprint Of The Building. Mechanical, Plumbing And Electrical Improvements. Special Inspections Required For: Steel, Con... |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Mesa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Consumer Products, Power Generation (CCGT), Raw Materials, Commercial, Metal |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
