Restaurant Building
Start · Pennsylvania · Last reported Jan 2025
Source: Dodge
For Level Ii Alterations To An Existing Tenant Space For Use As A Business Occupancy, Alterations To Include The Erection Of Partition Walls, Provide Finishes/Furnishings And Accessibility Improvments Throughout. All Work To Be Done Per Approved Plans. If Field Conditions Vary Contact Design Engineer Prior To The Start Of Any Work. Separate Permits To Be Obtained For All Other Work. | Number Of St
- Status
- Prospective
- Sector
- Consumer Products, Commercial, Raw Materials
- Location
- Philadelphia, Pennsylvania, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Restaurant Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | For Level Ii Alterations To An Existing Tenant Space For Use As A Business Occupancy, Alterations To Include The Erection Of Partition Walls, Provide Finishes/Furnishings And Accessibility Improvments Throughout. All Work To Be Done Per Approved Plans. If Field Conditions Vary Contact Design Engineer Prior To The Start Of Any Work. Separate Permits To Be Obtained For All Other Work. | Number Of Stories Above Grade: 1 Total Square Feet: 8104 |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Philadelphia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Commercial, Raw Materials |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
