Restaurant Building
Start · Pennsylvania · Last reported Nov 2024
Source: Dodge USA
LEVEL III ALTERATIONS TO INCLUDE INTERIOR ADDITION OF SECOND FLOOR FLOOR SPACE FOR STORAGE ACCESSORY TO EXPANDED RESTAURANT SPACE ON THE GROUND FLOOR OF AN EXISTING BUILDING AS PER APPROVED PLANS. EXISTING BUILDING NOT REQUIRED TO BE SPRINKLERED. Square Feet: 3382
- Status
- Prospective
- Sector
- Commercial, Raw Materials, Consumer Products, Manufacturing (Industrial)
- Location
- Philadelphia, Pennsylvania, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Restaurant Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | LEVEL III ALTERATIONS TO INCLUDE INTERIOR ADDITION OF SECOND FLOOR FLOOR SPACE FOR STORAGE ACCESSORY TO EXPANDED RESTAURANT SPACE ON THE GROUND FLOOR OF AN EXISTING BUILDING AS PER APPROVED PLANS. EXISTING BUILDING NOT REQUIRED TO BE SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP WORK** Square Feet: 3382 |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Philadelphia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Raw Materials, Consumer Products, Manufacturing (Industrial) |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
