Restoration and Expansion of Subhash Bridge
One of 9,007 projects Taiyo tracks in Gujarat.
Source: Devdiscourse
The Ahmedabad Municipal Corporation (AMC) has approved a plan to restore the 52-year-old Subhash Bridge over the Sabarmati River, which was closed due to structural damage. The project includes dismantling and replacing the existing superstructure, strengthening the piers, and constructing new two-lane bridges on both sides of the existing bridge to ease traffic congestion and improve connectivity
- Status
- Prospective
- Sector
- Government, Bridge, Road
- Location
- Ahmedabad, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- Devdiscourse
ConstructChat
Ask ConstructChat about Restoration and Expansion of Subhash Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Ahmedabad Municipal Corporation (AMC) has approved a plan to restore the 52-year-old Subhash Bridge over the Sabarmati River, which was closed due to structural damage. The project includes dismantling and replacing the existing superstructure, strengthening the piers, and constructing new two-lane bridges on both sides of the existing bridge to ease traffic congestion and improve connectivity. |
Original sector | Urban Development |
Budget |
Location
Country | India |
State | Gujarat |
City | Ahmedabad |
Source
Source | Devdiscourse |
URL |
More Details
Record type | Project |
Sector | Government, Bridge, Road |
Article published date | 2025-12-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
