Restroom and Locker Room Modernization
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Restroom and Locker Room Modernization Project comprises labor, material and services necessary for: Major components of Project Work consist of demolition and installation of new stall partitions, shower pans, plumbing fixtures and lighting fixtures. Demolition and replacement of associated mechanical exhaust ducting. New plumbing services (sanitary sewer, sanitary vent, domestic hot & cold water
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Residential, Manufacturing (Industrial), Commercial
- Location
- Van Nuys, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Restroom and Locker Room Modernization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Restroom and Locker Room Modernization Project comprises labor, material and services necessary for: Major components of Project Work consist of demolition and installation of new stall partitions, shower pans, plumbing fixtures and lighting fixtures. Demolition and replacement of associated mechanical exhaust ducting. New plumbing services (sanitary sewer, sanitary vent, domestic hot & cold water) to suit new fixture layouts. Demolition and installation of fire and life safety fixtures to me... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Van Nuys |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Residential, Manufacturing (Industrial), Commercial |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
