Restroom Remodel at South King Fire Station 63 & Station 64
Closed · Washington · Last reported Jul 2025
Source: Dodge
SKF is remodeling all restrooms at two (2) facilities at Fire Stations 63 and 64, totaling eleven (11) restrooms and one (1) hallway. Exhibit A is the floor plan of Station 63, Exhibit B is the floor plan for Station 64, and Exhibit C is the list of materials schedules. The restroom remodels include the demolition and removal of existing materials, as well as the installation of new showers with s
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Government
- Location
- Federal Way, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Restroom Remodel at South King Fire Station 63 & Station 64
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SKF is remodeling all restrooms at two (2) facilities at Fire Stations 63 and 64, totaling eleven (11) restrooms and one (1) hallway. Exhibit A is the floor plan of Station 63, Exhibit B is the floor plan for Station 64, and Exhibit C is the list of materials schedules. The restroom remodels include the demolition and removal of existing materials, as well as the installation of new showers with swinging doors, toilets, vanities, sinks, cabinetry, tile floors, and tile wainscotting. Additiona... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Federal Way |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
