Restructuring the public transport network in Greater Nouméa
Sector: Car parking • Location: France
Source: Proparco Groupe AFD (Agence Française de Développement)
The first Néobus line will connect the center of Nouméa to the Médipôle medical center in Dumbéa-sur-mer. It will be 13.3 km long and comprise 24 stations approximately 600 m apart, including 8 interchanges and two parking relays. This bus rapid transit system will have two reserved lanes and priority at traffic lights. It will offer high-quality transport in terms of frequency (a bus every 5 minu
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The first Néobus line will connect the center of Nouméa to the Médipôle medical center in Dumbéa-sur-mer. It will be 13.3 km long and comprise 24 stations approximately 600 m apart, including 8 interchanges and two parking relays. This bus rapid transit system will have two reserved lanes and priority at traffic lights. It will offer high-quality transport in terms of frequency (a bus every 5 minutes at peak times), the scale of the service (from 5 am to 9 pm), comfort, passenger information and access for persons with reduced mobility. It will be the backbone of Greater Nouméa’s future public transport network, called TANEO.The network’s lines will be restructured on the basis of Néobus in order to provide extensive services in the entire city. This new network will have a single ticketing system and tariff and will provide passengers with easier connections and better information.Finally, the project plans to develop soft modes, with the creation of cycle paths and pedestrian areas near the Néobus. The total cost of Line 1 is estimated at FCFP 20bn. The commissioning of Line 1 is scheduled for 2019. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
