Resurfacing Base Course Repair Concrete Curbing Driveway
Sector: Water Supply and Storage • Location: Plainfield, New Jersey, United States of America
Source: Dodge
The work includes the furnishing of all labor, material, and equipment necessary or required to complete all work set forth in the specifications. The work generally consists of milling, resurfacing with base course repair, concrete curbing, driveway apron repair, miscellaneous sidewalk repair, stormwater system repairs, and ADA compliant handicap ramps. The work contemplated under this Contract s
- Status
- Prospective
- Sector
- Water Supply and Storage, Car parking, Commercial, Automotive, Government, Cement, Road, Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Plainfield, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Resurfacing Base Course Repair Concrete Curbing Driveway
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes the furnishing of all labor, material, and equipment necessary or required to complete all work set forth in the specifications. The work generally consists of milling, resurfacing with base course repair, concrete curbing, driveway apron repair, miscellaneous sidewalk repair, stormwater system repairs, and ADA compliant handicap ramps. The work contemplated under this Contract shall be completed within 180 days of notice to proceed. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Plainfield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Commercial, Automotive, Government, Cement, Road, Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
