Retail Building Alteration
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Addition of new wall to accommodate new wall cabinet fixtures and all that comes with adding the wall, including ceiling grid adjustement, sprinkler adjustment, and electrical and low voltage additions. Also, swapping out some floor fixtures with some new floor fixtures. Square feet 3741
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Commercial
- Location
- Allen, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Retail Building Alteration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Addition of new wall to accommodate new wall cabinet fixtures and all that comes with adding the wall, including ceiling grid adjustement, sprinkler adjustment, and electrical and low voltage additions. Also, swapping out some floor fixtures with some new floor fixtures. Square feet 3741 |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Allen |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
