Retail Building Ti
Sector: Manufacturing (Industrial) • Location: Phoenix, Arizona, United States of America
Source: Dodge
LPBI - SUITE 420 REMODEL |: New retail TI in an existing retail center. Minor demo, new lights, store fixtures, and a restroom. Includes and exterior door but please look at the plan...the door is not visible from outside the delivery area. ALL WORK SUBJECT TO FIELD INSPECTOR'S APPROVAL. APPROVED PLANS MAY BE REQUIRED. ***INSPECTIONS REQUIRED PRIOR TO STARTING WORK. INSPECTION REQUEST PHONE NUMBER
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Commercial, Residential
- Location
- Phoenix, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Retail Building Ti
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | LPBI - SUITE 420 REMODEL |: New retail TI in an existing retail center. Minor demo, new lights, store fixtures, and a restroom. Includes and exterior door but please look at the plan...the door is not visible from outside the delivery area. ALL WORK SUBJECT TO FIELD INSPECTOR'S APPROVAL. APPROVED PLANS MAY BE REQUIRED. ***INSPECTIONS REQUIRED PRIOR TO STARTING WORK. INSPECTION REQUEST PHONE NUMBER IS (602) 495-0800*** |Sq.Ft. 6,019 |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Phoenix |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
