Retaining Wall & Storm Drain Improvement
Sector: Commercial • Location: Berkeley, California, United States of America
Source: Dodge USA
The work done under this component includes but is not limited to: traffic control; potholing; protection of underground utilities; survey monument and utility cover adjustments; tree removals; stump grinding; removal and replacement of retaining wall asphalt pavement, concrete pavement, sidewalk, and curb & gutter; retaining wall crack sealing; storm drain maintenance hole removal and replacement
- Status
- Closed
- Sector
- Commercial, Metal, Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Power Generation (CCGT)
- Location
- Berkeley, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Retaining Wall & Storm Drain Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work done under this component includes but is not limited to: traffic control; potholing; protection of underground utilities; survey monument and utility cover adjustments; tree removals; stump grinding; removal and replacement of retaining wall asphalt pavement, concrete pavement, sidewalk, and curb & gutter; retaining wall crack sealing; storm drain maintenance hole removal and replacement; removal and replacement of metal fence; removal and replacement of guardrails; pavement marker ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Berkeley |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Metal, Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Power Generation (CCGT) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
