Retaining Wall Construction Supply and Install
Sector: Cement • Location: Kamloops, British Columbia, Canada
Source: Dodge
Supply and installation of a Mechanically Stabilized Earth (MSE) wall and a buttress (consisting of rip rap rock and interlocking concrete blocks) at 47.5 km on the Sugar Lake FSR. Works include the supply and installation of all drainage materials at the site, and completion of the road running surface.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Supply and installation of a Mechanically Stabilized Earth (MSE) wall and a buttress (consisting of rip rap rock and interlocking concrete blocks) at 47.5 km on the Sugar Lake FSR. Works include the supply and installation of all drainage materials at the site, and completion of the road running surface. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
