Retaining Wall Replacement & Bridge Parapet Repair
Sector: Water Supply and Storage • Location: Wheaton, Illinois, United States of America
Source: Dodge USA
Description: RETAINING WALL REPAIR/REPLACEMENT AND BRIDGE PARAPET REPAIR, INCLUDING TREE REMOVAL (6 TO 15 UNITS DIAMETER) - 11 UNITS; TREE REMOVAL (OVER 15 UNITS DIAMETER) - 46 UNITS; TREE TRUNK PROTECTION - 4 EA; TREE ROOT PRUNING - 4 EA; SUPPLEMENTAL WATERING - 1.9 UNITS; TOPSOIL FURNISH AND PLACE, 6" - 197 SY; SEEDING, CLASS 2A - 0.01 AC; SODDING, SALT TOLERANT - 189 SY; CURB REMOVAL - 5 FT; ST
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Bridge, Cement, Road, Government
- Location
- Wheaton, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Retaining Wall Replacement & Bridge Parapet Repair
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Description: RETAINING WALL REPAIR/REPLACEMENT AND BRIDGE PARAPET REPAIR, INCLUDING TREE REMOVAL (6 TO 15 UNITS DIAMETER) - 11 UNITS; TREE REMOVAL (OVER 15 UNITS DIAMETER) - 46 UNITS; TREE TRUNK PROTECTION - 4 EA; TREE ROOT PRUNING - 4 EA; SUPPLEMENTAL WATERING - 1.9 UNITS; TOPSOIL FURNISH AND PLACE, 6" - 197 SY; SEEDING, CLASS 2A - 0.01 AC; SODDING, SALT TOLERANT - 189 SY; CURB REMOVAL - 5 FT; STRUCTURE EXCAVATION - 272 CY; TEMPORARY SOIL RETENTION SYSTEM - 1,086 SF; SEGMENTAL CONCRETE BLOCK... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Wheaton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Bridge, Cement, Road, Government |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
