Retaining Wall Replacement
Sector: Water Supply and Storage • Location: Cantonment, Florida, United States of America
Source: Dodge USA
Scope of Work for Retaining Wall Replacement The purpose of this project is to provide stability to the nearby structure & fill in a below grade area within the nearby structure used for heavy equipment repairs. Any materials will comply with ASTM and meet Florida Code Requirements. No permits required. Prep work Geotechnical investigation Sheet pile wall design ~115' high pressure water locate De
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Scope of Work for Retaining Wall Replacement The purpose of this project is to provide stability to the nearby structure & fill in a below grade area within the nearby structure used for heavy equipment repairs. Any materials will comply with ASTM and meet Florida Code Requirements. No permits required. Prep work Geotechnical investigation Sheet pile wall design ~115' high pressure water locate Demo work Remove existing timber retaining wall o Contractor can haul debris from old wall into Lan... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
