Retention Pond Maintenance at Gray Fox Crossing
Sector: Commercial • Location: Warner Robins, Georgia, United States of America
Source: Dodge USA
Retention Pond Maintenance and site clearing services. Location: Gray Fox Crossing, Warner Robins, Georgia (250 feet NW of Gray Fox Crossing and Sundowner Drive Intersection; 32 33 56 N, 83 38 42 W) Site clearing activities to include the removal of trees and vegetation above ground, on side slopes, and pond floor Vegetation cleared from fencing Stump grinding to ground level to include grubbing o
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Consumer Products, Waste Processing and Treatment, Government
- Location
- Warner Robins, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Retention Pond Maintenance at Gray Fox Crossing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Retention Pond Maintenance and site clearing services. Location: Gray Fox Crossing, Warner Robins, Georgia (250 feet NW of Gray Fox Crossing and Sundowner Drive Intersection; 32 33 56 N, 83 38 42 W) Site clearing activities to include the removal of trees and vegetation above ground, on side slopes, and pond floor Vegetation cleared from fencing Stump grinding to ground level to include grubbing or removal of root balls and/or stumps Undergrowth to be chipped and/or ground using mobile forest... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Warner Robins |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Consumer Products, Waste Processing and Treatment, Government |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
