logo

Rethinking Container Management Systems

Sector: Aerospace & Defense • Location: Italy, Spain, Germany, Israel, Poland, Slovenia

Source: EU Funding & Tenders Portal

Project
Ended

Container terminals serve thousands of ships, store billions of TEUs, compete to serve the next vessel, and introduction of larger ships will result in new challenges. While advances have been made in terminal automation (Automated Ground Vehicle (AGV), gate control, yard cranes, etc.), with current technologies terminals are limited by their ability to maintain growth and quality of service. To a

Project Information FAQ

Project Information

3 Q
The project “Rethinking Container Management Systems” is an infrastructure initiative in the Aerospace & Defense sector, located in Italy, Spain, Germany, Israel, Poland, Slovenia. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Container terminals serve thousands of ships, store billions of TEUs, compete to serve the next vessel, and introduction of larger ships will result in new challenges. While advances have been made in terminal automation (Automated Ground Vehicle (AGV), gate control, yard cranes, etc.), with current technologies terminals are limited by their ability to maintain growth and quality of service. To address these trends and demands the Robotic Container Management System (RCMS) has been developed. As a contribution to its implementation, Project main objectives are: A. to develop a detailed simulation model for RCMS to be evaluated in 2 Terminals (Gdansk and Koper) plus a set of generic simulation tools to be used in all terminals; B. to assess and compare RCMS performance with other state-of-the-art container handling technologies for 2 Terminals (Gdansk and Koper) with different features; C. to assess and compare RCMS performance with other state-of-the-art container handling technologies for 2 ports (Gdansk and Koper), with focus on comparison between RCMS solution and port surface extension; D. to assess impact of RCMS in a simulated transport network in terms of efficiency, reliability, capacity, performance indicators (travel times, average speed, etc.) and impacts (noise and air pollution) in the Port of La Spezia. Main results will be: a well-defined RCMS control logic; a dynamic physical AGV model to test AGV behavior; definition of operational procedures for RCMS; a generic simulation tool enabling testing of RCMS for various sites by non-simulation experts; an efficient entire terminal design with RCMS; a set of validated and quantified benefits of RCMS compared to commonly used handling systems; a set of Key Performances Indicators of the transport network using RCMS. Consortium is made by leading industries, SMEs, Research/Academic Centers and 3 ports/terminals as End-users. Project duration is 21 months and estimated eligible costs are 4 million €

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data