RETRADE-SA MPA Phase 4: Zambia - Malawi Interconnector Project

Sector: Mass Transit • Location: Zambia

Source: World Bank Group

Project
Pipeline

The Governments of Zambia and Malawi have, in line with the call for greater regional integration, agreed to strengthen their existing bilateral cooperation by among others, constructing the Zambia-Malawi (ZAMA) Interconnector. To this effect, an Inter-Governmental Memorandum of Understanding (IGMoU) between Zambia and Malawi was signed in August 2015 in Lusaka, Zambia. During the same time an Int

Project Information FAQ

Project Information

4 Q
The project “RETRADE-SA MPA Phase 4: Zambia - Malawi Interconnector Project” is an infrastructure initiative in the Mass Transit sector, located in Zambia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pipeline

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Governments of Zambia and Malawi have, in line with the call for greater regional integration, agreed to strengthen their existing bilateral cooperation by among others, constructing the Zambia-Malawi (ZAMA) Interconnector. To this effect, an Inter-Governmental Memorandum of Understanding (IGMoU) between Zambia and Malawi was signed in August 2015 in Lusaka, Zambia. During the same time an Inter-Utility Memorandum of Understanding (IUMoU) was also signed between ZESCO and ESCOM, the two respective national power utilities. Historically Zambia and Malawi have had cross border power trade at distribution level dating back to the year 2000 in which ESCOM started supplying power to Zambian towns in the border area. This was undertaken in response to a resolution of the then SADC Council of Energy Ministers. From 2018, Malawi has also been benefiting from the cross-border power supply from Zambia through a 33kV line from Chipata to Mchinji. The ZAMA Interconnector represents a critical initiative to strengthen regional energy integration and security in the region. The Government of Republic of Zambia through a letter dated June 6, 2024 (MFNP/EMD/101/25/5) requested the World Bank assistance for the ZAMA Interconnector Project. The proposed Project is in response the request and would be designed to address persistent electricity supply challenges in both Zambia and Malawi, while also supporting broader objectives of economic growth, climate resilience, and regional cooperation within the Southern African Power Pool (SAPP).The proposed interconnection consists of a 400kV double circuit overhead transmission line, extending approximately 193 kilometres. Of this, 146 kilometres will be constructed within Malawi, connecting the Nkhoma Substation to the border, while 47 kilometres will be built in Zambia, linking the border to the Chipata West Substation. Both terminal substations will be expanded to accommodate the new interconnection, including the installation of new 400kV bays, shunt reactors, and autotransformers.The proposed Project scope for Zambia comprises: (i) a 46.6 km segment of a 400kV double-circuit overhead transmission line from the Zambia/Malawi border to the existing Chipata West 330/132/33/11kV substation, using triple-bundle ACSR “Tern” conductor on self-supporting lattice steel towers in vertical configuration, within a 50 m right-of-way; (ii) the extension of Chipata West Substation to include a new 400kV switchyard with 2 line bays, 2 line-connected shunt reactors, 2 × 600 MVA 400/330kV autotransformers, a 400kV busbar system, and a new control building; and (iii) project management and technical assistance. The feasibility study, conceptual design, as well as tender documents, Environmental and Social Management Plan, and Resettlement Action Plan, financed by Swedfund through SAPP, have been completed and reviewed by World Bank team.The rationale for the Project is compelling. Malawi is currently investing in new hydropower capacity, most notably the Mpatamanga Hydropower Storage Project (MHSP) (350MW, COB by 2030). Its financial sustainability is contingent upon securing credible off-takers to back stop ESCOM payments, structured on take-or-pay basis. The ZAMA Interconnector will enable Malawi to export surplus hydropower to Zambia, whose mining sector is experiencing significant expansion and is a cornerstone of the national economy. Zambia’s mining operations, particularly in the Southern Copperbelt, are currently constrained by severe power supply challenges, frequent outages, and grid congestion. From a regional perspective, the Interconnector will enable cross-border electricity trade, system balancing, and long-term trading mechanisms. It will also enhance the resilience of both countries to climate variability, particularly droughts that have recently affected hydropower generation in the Zambezi basin. The Project is thus aligned with the strategic objectives of SAPP and the broader development goals of both countries. Additionally, the Interconnector will provide power to the Lobito Corridor. The Corridor is a strategic transport, industrial, and trade route centered on the railway line from the Port of Lobito in Angola to the Copperbelt regions of the Democratic Republic of Congo and Zambia. The total Corridor demand over the next 5–10 years is estimated at between 850 MW and 1,350 MW.The proposed Project would constitutes Phase 4 of the Regional Energy Transmission, Trade and Decarbonization Project in Southern Africa Region (RETRADE-SA) multi-phase programmatic approach (MPA) program, approved by the World Bank’s Executive Directors on January 21, 2025, with the first phase being the Zambia–Tanzania Interconnector Project (P507033).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data