Revalve and Fire Pump Service
Sector: Waste Processing and Treatment • Location: Clarkdale, Arizona, United States of America
Source: Dodge USA
This project entails the replacement of the valving interconnected with the pressure pumps, pressure tank, and well head, alongside the maintenance of the pump responsible for the fire suppression system. These components are situated within the confines of the pump room, pressure tank room, and well house at Tuzigoot National Monument
- Status
- Closed
- Sector
- Waste Processing and Treatment, Commercial, Water Supply and Storage
- Location
- Clarkdale, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Revalve and Fire Pump Service
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project entails the replacement of the valving interconnected with the pressure pumps, pressure tank, and well head, alongside the maintenance of the pump responsible for the fire suppression system. These components are situated within the confines of the pump room, pressure tank room, and well house at Tuzigoot National Monument |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Clarkdale |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Commercial, Water Supply and Storage |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
