Reventazon HPP

Sector: Water Supply and Storage • Location: Costa Rica

Source: International Finance Corporation (IFC)

Project
Completed

The Reventazon Hydropower Project (PHR) comprises the construction and operation of a dam and 305.5 MW hydroelectric power plant (HPP) on the Reventazón River, Province of Limón, located at 8 kilometers southeast of the city of Siquirres (Caribbean side of Costa Rica). The Project design includes the construction of a 130-m high dam, a 6.9 km2 reservoir with a volume of 118 MM m3, a 700-m long div

Project Information FAQ

Project Information

4 Q
The project “Reventazon HPP” is an infrastructure initiative in the Water Supply and Storage sector, located in Costa Rica. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Reventazon Hydropower Project (PHR) comprises the construction and operation of a dam and 305.5 MW hydroelectric power plant (HPP) on the Reventazón River, Province of Limón, located at 8 kilometers southeast of the city of Siquirres (Caribbean side of Costa Rica). The Project design includes the construction of a 130-m high dam, a 6.9 km2 reservoir with a volume of 118 MM m3, a 700-m long diversion tunnel, and hydroelectric generation facilities. In addition, the construction of the PHR also requires about 20 km of new internal access roads, a 1.8 km long Transmission Line, spoils disposal and construction materials extraction sites, and a construction camp. Project construction started in 2009 and is expected to end in 2015. The excavation of the temporary diversion tunnel for the construction of the dam and the river diversion infrastructure have been completed, construction of the spillway has started, and all of the ancillary infrastructure (e.g. access roads, construction camp, borrow pits) are completed and operational. The river diversion took place in April 2012, and dam construction has commenced. The PHR is the third hydroelectric dam project the Instituto Costarricence de Electricidad (“ICE” or “Client”) will construct in the Reventazón River and will be the hydroelectric project with the highest energy production in the Country. ICE currently operates three other HPPs on the Reventazón River: Cachi HPP has been in operation since 1966, it is the most upstream facility, with a capacity of 108 MW; Angostura, currently the most downstream hydropower plant, has operated since the year 2000 and has a capacity of 177 MW; and La Joya, which is operated by ICE under a BOT agreement, started operations in 2005 and is the smallest of the three with a capacity of 50 MW. The PHR is located about 38 km downstream of Angostura tailrace.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data