Reversible Hydroelectric Power Plant Bistrica
Sector: Power Generation (CCGT) • Location: Serbia
Source: Vreme
The project involves the construction of the reversible hydroelectric power plant Bistrica in Serbia. Initially estimated at 560 million euros, the cost has increased significantly to about 1.2 billion euros. The project is planned to be designed by the Japanese International Cooperation Agency (JICA) and financed by the Japanese Bank for International Cooperation (JBIC).
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Serbia
- Updated
- 22 Jul 2026
- Source
- Vreme
ConstructChat
Ask ConstructChat about Reversible Hydroelectric Power Plant Bistrica
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of the reversible hydroelectric power plant Bistrica in Serbia. Initially estimated at 560 million euros, the cost has increased significantly to about 1.2 billion euros. The project is planned to be designed by the Japanese International Cooperation Agency (JICA) and financed by the Japanese Bank for International Cooperation (JBIC). |
Original sector | Energy |
Budget |
Location
Country | Serbia |
Source
Source | Vreme |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2026-07-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
