logo

Revised Montreal Metro Blue Line Extension Project

Sector: Mass Transit • Location: Quebec, Canada

Source: Infrastructure Canada

Project
In Progress

The Société de transport de Montréal (STM) Montreal Metro’s Blue Line Extension project consists of extending the Montreal subway system eastward from Saint-Michel station to Anjou station. The scope of the project includes the construction of : • 5 new universally accessible stations over 6 km of tunnel; • 2 bus terminals; • 1 underground pedestrian tunnel providing a link to the future Pie-IX BR

Status
Under Construction
Sector
Mass Transit, Tunnel, Power Generation (CCGT), Car parking, Government, Automotive
Location
Quebec, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Revised Montreal Metro Blue Line Extension Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Revised Montreal Metro Blue Line Extension Project” is an infrastructure initiative in the Mass Transit sector, located in Quebec, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Société de transport de Montréal (STM) Montreal Metro’s Blue Line Extension project consists of extending the Montreal subway system eastward from Saint-Michel station to Anjou station. The scope of the project includes the construction of : • 5 new universally accessible stations over 6 km of tunnel; • 2 bus terminals; • 1 underground pedestrian tunnel providing a link to the future Pie-IX BRT • Several equipments and operational infrastructures: o 1 underground garage; o 6 new auxiliary structures and the modification of an existing auxiliary structure o 1 integral infrastructure, including a service center and a power station o 1 rear station with 6 positions for 9-car trains o 1 integral infrastructure, including a service center and a power station o 10 new rectifier rooms, including the addition of 3 rectifier rooms on the existing Blue Line (to allow the introduction of 9-car Azur trains on the Blue Line while the current line accommodates 6-car MR-73 trains), in addition to the 7 rectifier rooms planned for the extended network. The Blue Line Extension project aims to improve mobility in the Montreal metropolitan region, particularly in the east end of the island of Montreal, by increasing the modal share of public transit. The objectives of this project are to develop the network by promoting integrated mobility and to improve the customer experience. These objectives are in line with the STM’s 2025 organizational strategic plan.

Original sector

Public Transit

Budget

Location

Country

Canada

State

Quebec

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Mass Transit, Tunnel, Power Generation (CCGT), Car parking, Government, Automotive

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project