logo

Revival of South Carolina's Abandoned Nuclear Reactors at V.C. Summer Site

Sector: Power Transmission • Location: Jenkinsville, South Carolina, United States

Source: WACH

Project
Planned

South Carolina's stalled nuclear power project involving two half-built reactors at the V.C. Summer Nuclear Station could resume construction. A private company, Brookfield Asset Management, has offered $2.7 billion to the state-owned utility Santee Cooper and a small share of the power generated if an agreement is reached to complete and operate the reactors. The project was abandoned in 2017 due

Status
Prospective
Sector
Power Transmission, Nuclear, Power Generation (CCGT)
Location
Jenkinsville, South Carolina, United States of America
Updated
22 Jul 2026
Source
WACH

ConstructChat

Ask ConstructChat about Revival of South Carolina's Abandoned Nuclear Reactors at V.C. Summer Site

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Revival of South Carolina's Abandoned Nuclear Reactors at V.C. Summer Site” is an infrastructure initiative in the Power Transmission sector, located in Jenkinsville, South Carolina, United States. Taiyo aggregates data on it from WACH.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

South Carolina's stalled nuclear power project involving two half-built reactors at the V.C. Summer Nuclear Station could resume construction. A private company, Brookfield Asset Management, has offered $2.7 billion to the state-owned utility Santee Cooper and a small share of the power generated if an agreement is reached to complete and operate the reactors. The project was abandoned in 2017 due to delays and cost overruns. The deal includes Brookfield keeping at least 75% of the power generated, with negotiations expected to last up to two years. The project faces challenges including inspection of equipment after eight years of exposure, renewal of permits and licenses, and historical cost overruns associated with the reactor type.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

South Carolina

City

Jenkinsville

Source

Source

WACH

URL

More Details

Record type

Project

Sector

Power Transmission, Nuclear, Power Generation (CCGT)

Article published date

2025-12-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project