Rewa Sewerage Management and Treatment Infrastructure Project
The status, timeline and source of this project. A free account opens every field.
Source: India Investment Grid (IIG)
Information Ministry of Housing & Urban Affairs has come up with Rewa Sewerage Management and Treatment Infrastructure Project with a ticket size of 199.37 INR Crores. This project in Sewage collection, treatment, and disposal system sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Proje
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government
- Location
- Rewa, Madhya Pradesh, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Rewa Sewerage Management and Treatment Infrastructure Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information Ministry of Housing & Urban Affairs has come up with Rewa Sewerage Management and Treatment Infrastructure Project with a ticket size of 199.37 INR Crores. This project in Sewage collection, treatment, and disposal system sub-sector involves The current status of the project is Completion Certificate/COD and is being developed through the EPC route. Economic/Social Impact of the Project Under this project STP capacity of 25 MLD, Total in MLD 25, Length of Pipeline proposed in KM 395, Length of Pipeline constructed in KM 128, Sewer Connection proposed 42933, Sewer Connection achieved 798. |
Original sector | Waste & Water |
Procurement method | |
Budget |
Location
Country | India |
State | Madhya Pradesh |
City | Rewa |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government |
Article published date | 2024-02-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
