logo

Rewari-Rohtak Railway Line [81.26km] incl new material Modification for shifting of Rohtak-Gohana-Panipat through bypass line

Sector: Bridge • Location: Rewari, Haryana, India

Source: India Investment Grid (IIG)

Project
Closed

Information Ministry of Railways has come up with Rewari-Rohtak Railway Line & Modification Project with a ticket size of 1001 INR Crores. This project in Railway Track sub-sector involves Laying of New Track/Bridges. The current status of the project is out of total 86 km length, Rewari to Rohtak New line of 81 Km length has already been commissioned in 2013. Work of balance length of 5 Km length

Project Information FAQ

Project Information

5 Q
The project “Rewari-Rohtak Railway Line [81.26km] incl new material Modification for shifting of Rohtak-Gohana-Panipat through bypass line” is an infrastructure initiative in the Bridge sector, located in Rewari, Haryana, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Ministry of Railways has come up with Rewari-Rohtak Railway Line & Modification Project with a ticket size of 1001 INR Crores. This project in Railway Track sub-sector involves Laying of New Track/Bridges. The current status of the project is out of total 86 km length, Rewari to Rohtak New line of 81 Km length has already been commissioned in 2013. Work of balance length of 5 Km length pertains to construction of viaduct in Rohtak City to shift the existing Rohtak- Gohana- panipat line in Rohtak City over this viaduct portion. The work is in advance stage of completion and planned to be commissioned in jan'2021. Economic/Social Impact of the Project Rewari to Rohtak New line of 81 Km length has already been commissioned in 2013. New elevated line of4.85 Km length has been sanctioned in Jan17 as part of this project. After commissioning of this line four busy level crossings in the heart of the Rohtak city will be eliminated. This will render better and safe train operation and will decongest the Rohtak city area.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data