Reworld Preston Facility Proposal
Proposed · Connecticut · Last reported Dec 2025
Source: Waste Dive
Reworld is proposing to build a new facility in Preston, Connecticut, which could more than double the incineration capacity from 230,000 tons per year to about 500,000 tons. This facility aims to address the increasing waste disposal needs in the state.
- Status
- Prospective
- Sector
- Waste Processing and Treatment
- Location
- Preston, Connecticut, United States of America
- Updated
- 19 Nov 2026
- Source
- Waste Dive
ConstructChat
Ask ConstructChat about Reworld Preston Facility Proposal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Reworld is proposing to build a new facility in Preston, Connecticut, which could more than double the incineration capacity from 230,000 tons per year to about 500,000 tons. This facility aims to address the increasing waste disposal needs in the state. |
Original sector | Waste Management |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Preston |
Source
Source | Waste Dive |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
