Reynosa Wind Farm
Sector: Car parking • Location: Mexico
Source: World Bank Group
The Reynosa wind farm is located in the northeastern state of Tamaulipas and will have total capacity of 424 MW. It will supply enough electricity to the Mexican national grid to power about 1 million homes and mitigate 739,000 tonnes of carbon dioxide emissions annually. Project is being developed by Zuma Energia which is 80% owned by Actis and 20% by Mesoamerica Investments.
Zuma won the contr
- Status
- Prospective
- Sector
- Car parking, Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Residential, Automotive, Commercial
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Reynosa Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Reynosa wind farm is located in the northeastern state of Tamaulipas and will have total capacity of 424 MW. It will supply enough electricity to the Mexican national grid to power about 1 million homes and mitigate 739,000 tonnes of carbon dioxide emissions annually. Project is being developed by Zuma Energia which is 80% owned by Actis and 20% by Mesoamerica Investments. Zuma won the contract for the Reynosa farm in Mexico’s second renewable energy auction in 2016. Parque Eólico Reynosa III, S.A.P.I de C.V. is the project company that will lead the project on behalf of the sponsor. The wind farm will require an estimated investment of $740.1 million. In addition to the $615.1 million in project finance raised largely from Mexican development banks - Banobras, Banco Nacional de Comercio Exterior (Bancomext) and Nacional Financiera (Nafin), as well as Santander, Actis and Mesoamerica have put in $125 million in equity. Financial closure was reached in August 2017. Reynosa plant will be up and running by the end of 2018. http://www.power-technology.com/news/newsacciona-to-develop-424mw-wind-farm-in-reynosa-mexico-5899362/ https://www.bnamericas.com/project-profile/en/parque-eolico-reynosa-nuevo-parque-eolico-reynosa https://www.ft.com/content/6c8e6bc4-69d0-331c-8fa8-2fcde57029f4 http://www.mexico-now.com/index.php/article/2749-zuma-energia-secures-funds-for-mexico-s-biggest-wind-farm-project-to-date |
Original sector | Energy |
Budget |
Location
Country | Mexico |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Car parking, Wind, Raw Materials, Power Generation (CCGT), Government, Manufacturing (Industrial), Residential, Automotive, Commercial |
Article published date | 2024-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
