RFI - Rapid Encapsulation of Pipelines Avoiding Intensive Replacement (REPAIR)
Sector: Natural Gas • Location: United States of America
Source: Grants.gov
This is a Request for Information only. This RFI is not accepting applications for financial assistance. The purpose of this RFI is solely to solicit input for ARPA-E consideration to inform the possible formulation of future programs.
ARPA‐E seeks input from experts in the fields of pipeline testing, advanced coating materials, biomimetic materials, smart materials (e.g., self-healing, or s
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | archived |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This is a Request for Information only. This RFI is not accepting applications for financial assistance. The purpose of this RFI is solely to solicit input for ARPA-E consideration to inform the possible formulation of future programs. ARPA‐E seeks input from experts in the fields of pipeline testing, advanced coating materials, biomimetic materials, smart materials (e.g., self-healing, or self-monitoring), robotic coating deposition tools, material inspection techniques, pipeline mapping tools, 3-D data visualization and data management, control and systems engineering, and gas pipeline operation; as well as service providers who replace, inspect, and locate natural gas utility pipelines. ARPA-E is seeking comments on a draft technical section for a possible future program solicitation, which focuses on the suite of technologies required to rehabilitate cast iron, wrought iron, and bare steel natural gas distribution pipes by creating a new pipe inside the old pipe. The new pipe will meet utilities’ and regulatory agencies’ requirements, have a minimum life of 50 years, and have sufficient material properties to operate throughout its service life without reliance on the exterior pipe. The information you provide may be used by ARPA-E in support of program planning. THIS IS A REQUEST FOR INFORMATION ONLY. THIS NOTICE DOES NOT CONSTITUTE A FUNDING OPPORTUNITY ANNOUNCEMENT (FOA). NO FOA EXISTS AT THIS TIME. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
