RFP/AE: 2020 Apex Pumping
Request for proposals · Nunavut · Last reported Apr 2020
Source: Dodge USA
The objective of this project is to maximize raw water levels in the Lake Geraldine water reservoir, through pumping operations from the Niaqunguk (`Apex?) River. This objective will be achieved by pumping raw water from the Apex River starting during the 2020 freshet and ending in Fall 2020. Pumping activities shall be constrained by minimum water levels in the Apex River.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Iqaluit, Nunavut, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: 2020 Apex Pumping
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Request for Proposals |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The objective of this project is to maximize raw water levels in the Lake Geraldine water reservoir, through pumping operations from the Niaqunguk (`Apex?) River. This objective will be achieved by pumping raw water from the Apex River starting during the 2020 freshet and ending in Fall 2020. Pumping activities shall be constrained by minimum water levels in the Apex River. |
Procurement method |
Location
Country | Canada |
State | Nunavut |
City | Iqaluit |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
