RFP/AE: 2021-22 Underground Utility and Surface works
Sector: Water Supply and Storage • Location: Sidney, British Columbia, Canada
Source: Dodge USA
The Consultant is to provide engineering design services and produce stand-alone drawing sets for each individual project. Subject to the delivery method for each project, the Consultant may be required to provide additional services including tendering, technical services, contract administration, inspection, and closeout. The project locations are as follows: ? Amelia Avenue ? Bowerbank Road to
- Status
- Prospective
- Sector
- Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Government, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Sidney, British Columbia, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: 2021-22 Underground Utility and Surface works
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Request for Proposals |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Consultant is to provide engineering design services and produce stand-alone drawing sets for each individual project. Subject to the delivery method for each project, the Consultant may be required to provide additional services including tendering, technical services, contract administration, inspection, and closeout. The project locations are as follows: ? Amelia Avenue ? Bowerbank Road to Grove Crescent (water, storm, and sanitary) ? James White Boulevard ? Seventh Street to Pat Bay H... |
Procurement method |
Location
Country | Canada |
State | British Columbia |
City | Sidney |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Government, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-02-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
