logo
ProjectClosed

RFP/AE: 4th over Argo Railyard Bridge Replacement

One of 10,000+ projects Taiyo tracks in Washington.

Source: Dodge USA

Comprehensive engineering team delivering design for a proposed replacement of the 4th over Argo Railyard Bridge. This SDOT 23-051QP 4th over Argo Railyard Bridge Replacement Planning Study (FHWA) Page 4 of 19 FAS Version 12/1/2023 Federal Version 1/22/2020 will allow the City to determine the best type of replacement for the 4th Avenue Bridge as well as define its limits. Comprehensive engineerin

Status
Closed
Sector
Bridge, Rail, Mass Transit, Government, Commercial
Location
Seattle, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/AE: 4th over Argo Railyard Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: 4th over Argo Railyard Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Seattle, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Comprehensive engineering team delivering design for a proposed replacement of the 4th over Argo Railyard Bridge. This SDOT 23-051QP 4th over Argo Railyard Bridge Replacement Planning Study (FHWA) Page 4 of 19 FAS Version 12/1/2023 Federal Version 1/22/2020 will allow the City to determine the best type of replacement for the 4th Avenue Bridge as well as define its limits. Comprehensive engineering team delivering design for a proposed replacement of the 4th over Argo Railyard Bridge. This SD...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Seattle

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Rail, Mass Transit, Government, Commercial

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project