RFP/AE: Advanced Metering Infrastructure IQC
Closed · North Carolina · Last reported Jan 2025
Source: Dodge
To design, supply, installation, and implementation of Advanced Metering Infrastructure (AMI) for water and electric utilities. To design, supply, installation, and implementation of Advanced Metering Infrastructure (AMI) for water and electric utilities.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Commercial, Waste Processing and Treatment
- Location
- Lumberton, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/AE: Advanced Metering Infrastructure IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To design, supply, installation, and implementation of Advanced Metering Infrastructure (AMI) for water and electric utilities. To design, supply, installation, and implementation of Advanced Metering Infrastructure (AMI) for water and electric utilities. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Lumberton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Commercial, Waste Processing and Treatment |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
