RFP/AE: Advanced Metering Infrastructure IQC
Request for proposals · North Carolina · Last reported Nov 2024
Source: Dodge USA
To design, supply, installation, and implementation of Advanced Metering Infrastructure (AMI) for water and electric utilities. To design, supply, installation, and implementation of Advanced Metering Infrastructure (AMI) for water and electric utilities.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Power Transmission
- Location
- Lumberton, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: Advanced Metering Infrastructure IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Request for Proposals |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To design, supply, installation, and implementation of Advanced Metering Infrastructure (AMI) for water and electric utilities. To design, supply, installation, and implementation of Advanced Metering Infrastructure (AMI) for water and electric utilities. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Lumberton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Power Transmission |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
