RFP/AE: Bear River Control Structure Annual Regulatory Inspe
One of 10,000+ projects Taiyo tracks in Alberta.
Source: Dodge
AB-2024-10098 Bear River Control Structure Annual Regulatory Inspections - The City of Grande Prairie (the City ) is requesting detailed and comprehensive proposals from Engineering consulting firms specializing in dam and spillway inspections to undertake the City of Grande Prairie s formal annual Engineering inspection of the Bear River Control Structure, as required under the Water Act. All wor
- Status
- Closed
- Sector
- Hydro, Government, Commercial, Water Supply and Storage
- Location
- Grande Prairie, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/AE: Bear River Control Structure Annual Regulatory Inspe
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | AB-2024-10098 Bear River Control Structure Annual Regulatory Inspections - The City of Grande Prairie (the City ) is requesting detailed and comprehensive proposals from Engineering consulting firms specializing in dam and spillway inspections to undertake the City of Grande Prairie s formal annual Engineering inspection of the Bear River Control Structure, as required under the Water Act. All work shall meet or exceed the City s Construction Manual and Design Manual and the Water Act, along ... |
Budget |
Location
Country | Canada |
State | Alberta |
City | Grande Prairie |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Hydro, Government, Commercial, Water Supply and Storage |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
