logo
ProjectClosed

RFP/AE: Bluegrass Boulevard CR 310

One of 10,000+ projects Taiyo tracks in Ohio.

Source: Dodge USA

Construction contract plans for extending Bluegrass Boulevard (CR 310) from the existing roundabout with Innovation Way to State Route 729. Project length is approximately 1.40 miles and within Jefferson Township, Fayette County, Ohio. Road shall be a two-lane rural roadway (with room for a future 4 lane section 140 right of way and Design Speed of 35 MPH), with paved berms, open ditches, underdra

Status
Closed
Sector
Government, Manufacturing (Industrial), Road, Waste Processing and Treatment, Commercial
Location
Jefferson Township, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/AE: Bluegrass Boulevard CR 310

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Bluegrass Boulevard CR 310” is an infrastructure initiative in the Government sector, located in Jefferson Township, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction contract plans for extending Bluegrass Boulevard (CR 310) from the existing roundabout with Innovation Way to State Route 729. Project length is approximately 1.40 miles and within Jefferson Township, Fayette County, Ohio. Road shall be a two-lane rural roadway (with room for a future 4 lane section 140 right of way and Design Speed of 35 MPH), with paved berms, open ditches, underdrains, guardrail, drainage and a crossing of the Missouri Ditch. Project shall include a single lan...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Jefferson Township

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Manufacturing (Industrial), Road, Waste Processing and Treatment, Commercial

Article published date

2024-10-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project