RFP/AE: Bridge 107 Deck Replacement
Sector: Bridge • Location: Anderson, Indiana, United States of America
Source: Dodge USA
Bridge 107 Deck Replacement. Removal and replacement of the concrete deck, bridge railing and approach guardrail. Widen the bridge to a clear width of 30’-0”. Eliminate existing joints. Replace concrete approach slabs and patch beams, piers and abutments. Place riprap to reduce scour. Approach work limited to 150’ at each end. Bridge is 364’ long. Professional services - Construction Inspection
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Bridge 107 Deck Replacement. Removal and replacement of the concrete deck, bridge railing and approach guardrail. Widen the bridge to a clear width of 30’-0”. Eliminate existing joints. Replace concrete approach slabs and patch beams, piers and abutments. Place riprap to reduce scour. Approach work limited to 150’ at each end. Bridge is 364’ long. Professional services - Construction Inspection |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in United States of America
- Silverado Canyon Road Bridge ( 55C - 0175 ) Replacement
- Modjeska Canyon Road Bridge ( 55C0172 ) Retrofit
- Application of the California Rapid Assessment Method on Strawberry Creek
- Nine Ten Place
- Clinton Keith Extension Project
- Chuckwalla Valley Road Bridge
- Jurupa Grade Separation
- Center St & Stephens Ave Resurfacing
