RFP/AE: Bridge Replacements Rte no 67
Closed · Missouri · Last reported Dec 2024
Source: Dodge USA
Bridge Replacements (F0665,K0982, & K0983) Consultant to prepare all preliminary, right of way, final roadway design and plan preparation as necessary to submit final roadway plans, specifications, and estimates. (PS&E). Hydraulic analysis of all drainage structures, reporting and coordination with any drainage districts, municipalities, and other government agencies. Support MoDOT Staff with publ
- Status
- Closed
- Sector
- Bridge, Government, Road, Commercial, Waste Processing and Treatment
- Location
- Poplar Bluff, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: Bridge Replacements Rte no 67
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bridge Replacements (F0665,K0982, & K0983) Consultant to prepare all preliminary, right of way, final roadway design and plan preparation as necessary to submit final roadway plans, specifications, and estimates. (PS&E). Hydraulic analysis of all drainage structures, reporting and coordination with any drainage districts, municipalities, and other government agencies. Support MoDOT Staff with public outreach Bridge Replacements (F0665,K0982, & K0983) Consultant to prepare all preliminary, rig... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Poplar Bluff |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Government, Road, Commercial, Waste Processing and Treatment |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
