RFP/AE: Brockville Campus Heating and Cooling Design
Sector: Government • Location: Brockville, Ontario, Canada
Source: Dodge USA
The existing chiller and cooling tower that services the Yellow wing on the Brockville campus is close to its end of life. As part of the college s greenhouse gas reduction plan, it has been proposed that this system should be replaced with a ground source heat pump solution where the winter heating loads can also be added to this system to help reduce GHG emissions.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The existing chiller and cooling tower that services the Yellow wing on the Brockville campus is close to its end of life. As part of the college s greenhouse gas reduction plan, it has been proposed that this system should be replaced with a ground source heat pump solution where the winter heating loads can also be added to this system to help reduce GHG emissions. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
