RFP/AE: Compton Subsidence Phase II Engineering
Sector: Road • Location: Pocahontas, Virginia, United States of America
Source: Dodge USA
Engineering services for design and construction period services for the Compton Subsidence Phase II Engineering project. Project is located at 1963 Peeled Chestnut Road, Pocahontas, VA. The goal of the project is to remove the failing wall, construct a stabilization feature, and drainage improvements located behind the residence. The work to be performed consists of drainage improvements, stabili
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Engineering services for design and construction period services for the Compton Subsidence Phase II Engineering project. Project is located at 1963 Peeled Chestnut Road, Pocahontas, VA. The goal of the project is to remove the failing wall, construct a stabilization feature, and drainage improvements located behind the residence. The work to be performed consists of drainage improvements, stabilization of existing slope and slide area, construction of stabilization feature, diversion ditches... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States of America
- Bothell Everett Highway Overlay Project
- 102nd Ave NE Downtown Access Improvements
- Beardslee Blvd Widening
- 228th St SE Overlay (2nd Ave SE to 9th Ave SE) Project
- 2023 Citywide Pedestrian Safety Improvements Project
- NE 188th St Non-Motorized Improvements
- 2019-ADA Curb Ramps
- NE 185th St Utility Improvements Project
